Manufacturing & Industrial Construction

Manufacturing plant construction built around the equipment and the loads that go into plants, shops and production space.
Discuss Your ProjectAll Services
Market we serve

Manufacturing plant construction around the equipment going in

Manufacturing plant construction is work where the building follows the equipment, not the other way around. Before the footprint is set we want to know what runs inside, how heavy it is, how it gets fed, and what has to be lifted over it.

Northeast Wisconsin runs on converting, machining, fabrication, forging and packaging, and those buildings share a set of problems: floors that carry real load, clear spans without columns in the wrong place, bays tall enough for an overhead crane, and foundations that keep a machine in alignment for years.

Our crews handle steel fabrication and steel erection, pour our own concrete, and set machinery with our own millwright and rigging crew. For a straightforward envelope on a fast schedule, pre-engineered steel buildings often make the most sense.

Manufacturing plant construction we take on

N

Production floors

Slabs designed for the forklift, racking and machine loads that will actually sit on them.

N

Crane bays

Structure and runway for overhead cranes, built to the capacity you need now and later.

N

Machine foundations

Isolated bases and pits poured to the equipment drawings and checked for alignment.

N

Clear-span shops

Open floor without columns in the middle of the process.

N

Plant additions

More floor space added while the operation inside keeps running.

N

Mezzanines and platforms

Fabricated steel access, catwalks and equipment platforms.

N

Plant offices

Office, QA and break space built into or onto the production building.

Good to know

Questions we hear about manufacturing plant construction

Not covered here? Call (920) 833-6465 or send us the basics and we will answer it directly. Ask about equipment loads, production flow, utility coordination and construction around an operating manufacturing plant.

Can you build around production?

Most of our plant work happens in buildings that never stop. We phase it, wall it off, and schedule the tie-ins and shutdowns around your production calendar instead of ours.

How thick does an industrial floor slab need to be?

It depends on the loads, the subgrade and the joint layout, not on a rule of thumb. Tell us the equipment, the racking and the lift traffic and we will have it designed properly rather than guessed.

Do you install overhead cranes?

We build the structure and runway for them and set them with our own crane and millwright crews. The crane supplier handles the equipment itself and we coordinate the two.

Can you move a machine from an old plant to a new one?

Yes. Disconnect, rigging, transport, setting and alignment are all things our millwright crew does, and we can pour the new foundation on the same contract.

Is a pre-engineered building cheaper than conventional steel?

Often, for a simple envelope on a tight schedule. Where the geometry is unusual or the loads are heavy and specific, conventional fabricated steel can be the better answer. We will price it both ways.

How early should we talk?

Earlier than most people think. Budget pricing, design and state plan review all take time, and the cheapest changes are the ones made before anything is drawn.