Questions to Ask Before You Hire a Commercial Contractor
Twelve questions that separate the contractor who will hold your schedule from the one who will explain why they could not. Discuss Your ProjectAll ArticlesWorking with a contractor
Price is the last question, not the first
Even contractors bidding the same drawings can return different prices because of allowances, exclusions, procurement and scheduling assumptions. What separates them is what happens when the soil is worse than the report said, when the steel is late, or when you need to move a wall after the slab is poured. These questions get at that.
About the work itself
1. Which trades do you self-perform?
This is the highest-signal question on the list. A contractor who subcontracts everything is a scheduler. A contractor with their own concrete, carpentry and steel crews controls the parts of the schedule that usually slip. Ask specifically, and ask whether those crews are currently committed elsewhere.
2. Who is actually on my site every day?
Get the name of the superintendent, not the salesperson. Ask how many other jobs that person is running. Ask to meet them before you sign.
3. Have you built this building type before?
A food plant is not a warehouse with better floors. A contractor who has not done sanitary design, washdown environments or refrigerated space will learn on your project. Ask for two similar buildings and call those owners.
4. Who handles the plan review submittal?
Ask who will prepare the submission, which authority reviews it and what approvals are needed before work begins. Wisconsin projects may be reviewed by DSPS or an authorized delegated municipality. Check the DSPS commercial building guidance and confirm current review timing for your site. A complete submission and prompt responses to reviewer questions belong in the schedule.
About money
5. When will I know the real number?
In design-build, pricing happens during design, so you see cost while you can still change the decision driving it. In design-bid-build you find out after the drawings are done. Know which you are buying.
6. What is in your allowances, and what is not?
Allowances are where bids get artificially competitive. A low number with thin allowances is not a low number. Ask for the assumptions behind each one.
7. How do you handle change orders?
Ask what their change order rate was on their last three projects. The answer tells you whether they price carefully or price to win.
8. How are long-lead materials handled?
Ask when steel and other long-lead items will be released, when supplier pricing is confirmed, and who carries escalation risk if an order is delayed. Request a procurement schedule tied to the design decisions and required approvals.
About risk
9. What is your experience modification rate?
The EMR is a workers’ compensation figure that reflects a contractor’s actual safety record. Below 1.0 is better than average. Any commercial contractor should be able to tell you theirs without checking.
10. Can I see your certificate of insurance and bonding capacity?
Not just whether they have it, but whether their single-project bonding capacity comfortably exceeds your project. A contractor at the edge of their capacity is a risk to you.
11. What happens if you are late?
Ask directly. The answer, and how comfortable they are giving it, tells you a lot.
12. Who do I call at 6am on a Saturday?
On a plant shutdown or a weather event, you will need somebody who answers. Find out who that is now.
Two things worth doing yourself
Visit an active jobsite. Not a finished building, an active one. Is it organised? Is material stored properly? Are people wearing their protective equipment when nobody important is watching? Fifteen minutes on a live site tells you more than any reference call.
Call a reference from five years ago, not last year. Recent clients are still in the glow. Ask someone five years out how the building has held up and whether the contractor came back when something needed attention.
How Schuh answers these
We self-perform concrete, carpentry, steel fabrication and steel erection with our own crews, and we run our own crane fleet with our own operators. We have built across Green Bay, the Fox Valley and the rest of Northeast Wisconsin since 1976, and the portfolio shows the building types. If you want to see the process, how we build lays it out.
Ask us all twelve. Discuss your project or call (920) 833-6465.
Talk to Schuh
Call (920) 833-6465 or send a project inquiry and we will come back with next steps.
Planning a building, addition or renovation?
Tell us about the project and we will come back with next steps. Or call (920) 833-6465.