Warehouse & Distribution Construction

Warehouse construction with clear-span buildings, dock walls and truck courts sized for the fleet that will use them.
Discuss Your ProjectAll Services
Market we serve

Warehouse construction sized to the racking and the trucks

Warehouse construction looks simple from the outside and usually is not. The three things that decide whether the building works are the slab, the clear height and the truck court, and all three are cheaper to get right on paper than to fix later.

We start from the racking layout and the fleet. Bay spacing follows the rack, floor flatness follows the lift equipment, dock height and apron depth follow the trailers, and the column grid stays out of the aisles. Then the envelope goes on top of that.

Most distribution buildings we put up are pre-engineered steel buildings, erected by our own crew, on foundations and floors our own concrete crew pours. For expansions onto an existing building, see additions and renovations.

Warehouse construction for distribution clients

N

Clear-span buildings

Open floor with the column grid worked around the rack layout, not through it.

N

Warehouse floors

Slabs poured flat and jointed for the lift equipment and rack loads they will carry.

N

Dock walls and levelers

Dock height, pit layout and leveler pockets set to the trailers you actually run.

N

Truck courts and aprons

Heavy-duty paving and concrete aprons where the trailers turn and park.

N

Cold and climate space

Insulated panel and vapor control where part of the building has to hold temperature.

N

Warehouse additions

Added bays onto a building that keeps shipping through the work.

N

Office and dispatch

Front office, driver areas and dispatch space built into the same shell.

Warehouse & Distribution Projects

Explore completed projects and see the work behind our services.

View all projects

Good to know

Questions we hear about warehouse construction

Not covered here? Call (920) 833-6465 or send us the basics and we will answer it directly. Ask about clear heights, floor loads, loading docks and planning storage or distribution space around your operation.

How soon can a steel building go up?

Pre-engineered steel has a lead time for the package, and that lead time is usually the longest single item in the schedule. Foundations go in while the steel is being made, so the earlier the package is released, the earlier you occupy.

What floor flatness do we need?

It depends on the lift equipment and the rack height. Narrow-aisle and high-reach equipment need tighter flatness than a standard counterbalance forklift. Tell us the equipment and we will specify to it.

Can you add onto our existing warehouse?

Yes, and that is a large share of our work. We build the addition outside the existing wall and tie in during a window that fits your shipping schedule.

Do you handle the site work and paving?

We manage the full site package, and we self-perform the concrete portions. Asphalt paving and utilities go to subcontractors we manage under the same contract.

Can the building be expanded later?

Yes, if it is planned now. Leaving an expansion end, sizing the footings and setting the utility runs with a future bay in mind costs very little up front and saves a lot later.

Where do you work?

Across Northeast Wisconsin, most often in Green Bay, Appleton and the Fox Valley.

Planning a building, addition or renovation?

Tell us about the project and we will come back with next steps. Or call (920) 833-6465.