What a Design-Build Contractor Actually Does
One contract, one team, and a schedule that does not wait on three rounds of bidding. Here is how design-build works and when it is the right call. Discuss Your ProjectAll ArticlesBuilding methods
The short version
In design-build, you sign one contract with one company that handles both the design and the construction. In the older design-bid-build model you hire an architect first, take the finished drawings out to bid, then hire whichever contractor comes back lowest. Two contracts, two companies, and a gap in the middle where nobody owns the overlap.
That gap is where most commercial projects lose time and money. The drawings get finished before anyone has priced them. The bids come back over budget. The design goes back for revision. Months disappear before a shovel moves.
What the research actually shows
The CII/Pankow Revisiting Project Delivery Performance, 1998–2018 report compares a newer sample of 212 projects completed in 2008–2013 with the original 1998 benchmarks.
- The newer sample had median cost growth of 0.9% for design-build and 1.9% for design-bid-build.
- Median schedule growth was 0.0% for design-build and 2.5% for design-bid-build.
- The regression comparison reported 102% faster delivery and 36% faster construction for design-build.
These are study comparisons, not a forecast or a guarantee for your building. Scope, approvals, procurement, site conditions and team decisions still determine the actual budget and completion date.
What that means for an owner
Early pricing makes it easier to understand costs while design choices are still open. Review the contract’s allowances, exclusions and change process so you know what the agreed price covers.
Where the savings actually come from
Nothing about design-build is magic. The gains come from removing the handoffs.
Pricing happens during design, not after
When the people who will build it are in the room while it is being drawn, you get a real number at every stage. A 40 foot clear span becomes a line item you can see, not a surprise in a bid six months later. If the budget will not carry it, you find out on a Tuesday afternoon instead of after the drawings are stamped.
Long-lead items get ordered earlier
Steel, equipment and other long-lead materials can affect both cost and schedule. When design and construction work together, the team can identify release dates and procurement requirements early. Ask when supplier pricing is confirmed, how long the quote remains valid and what changes could affect the order.
There is nobody to point at
With one team responsible for design and construction, drawing conflicts can be addressed through a shared process. Changes can still affect cost, so responsibilities and the approval process should be clear in the contract.
When design-build is not the right answer
It is not always. If you already have a complete set of construction documents from an architect you trust, you do not need design-build, you need a good general contractor to build them. If your project is publicly funded, your procurement rules may require competitive bidding on a finished design. And if you genuinely want three independent prices on identical drawings, design-bid-build is the model that gives you that.
Design-build fits best when the building is not fully defined yet, when the schedule matters, or when the work has to happen around an operation that cannot stop.
What it looks like with Schuh
Schuh Construction has run design-build projects across Green Bay, the Fox Valley and the rest of Northeast Wisconsin since 1976, and we self-perform the core trades rather than subcontracting them out. Concrete, carpentry, steel fabrication and steel erection are our own crews, and the crane fleet is ours with our own operators. That is why the schedule holds. When the concrete crew is a phone call away instead of a subcontractor juggling four other jobs, a weather delay costs you days instead of weeks.
If you want the step by step, how we build walks through our process from first conversation to closeout. If you want to see the result, the project portfolio covers manufacturing plants, food processing facilities, warehouses and commercial buildings across the region.
Where to start
The first conversation costs nothing and usually takes under an hour. Bring whatever you have: a site, a sketch, a square footage target, or just a problem your current building cannot solve. We will tell you what it is likely to cost and how long it will take before you spend anything on design.
Discuss your project or call (920) 833-6465.
Talk to Schuh
Call (920) 833-6465 or send a project inquiry and we will come back with next steps.
Planning a building, addition or renovation?
Tell us about the project and we will come back with next steps. Or call (920) 833-6465.